翻译尚未完成,当前显示原文。
BERLIN — Germany's electric vehicle subsidy scheme is running out of money far faster than the government anticipated. The program was supposed to last until 2029, but at the current rate of spending its entire €2.7 billion budget could be gone by the end of 2027, according to a document prepared for final negotiations on Germany's 2027 federal budget and seen by WELT, a sister publication of POLITICO in the Axel Springer Group. "The EV subsidy scheme is developing far more dynamically than anticipated when it was designed and its funding requirements were originally calculated," the document states. The budget allocation is being adjusted, but "without changing the overall size of the program.
我们公开展示核心要点。创建免费账户后可继续阅读全文、保存、讨论,并结合市场和 OSINT 背景分析。
