翻译尚未完成,当前显示原文。
As reported by Ukrinform, DTEK Group said this in a Telegram post . The company noted that energy workers spent four days restoring power to more than 203,000 households. More than 200 repair crews are working on restoration efforts every day. In addition, Russia is targeting Ukrenergo’s high-voltage transmission networks, which supply electricity to the region. As a result, the operator has been forced to introduce emergency and stabilization power outages. According to DTEK, another problem is the simultaneous switching on of high-powered electrical appliances after power is restored. “The networks become overloaded, causing new outages. There are now hundreds of such cases every day,” the company stressed.
我们公开展示核心要点。创建免费账户后可继续阅读全文、保存、讨论,并结合市场和 OSINT 背景分析。
